For sale Apartment Costa Del Sol Marbella West € 1.410.000,-
Ref.no: INCslg692new
Price: € 1.410.000,-
For sale Apartment Costa Del Sol Marbella West € 1.410.000,-
Bedrooms | 4 |
Bathrooms | 3 |
Lot size | 275m² |
Living area | 275m² |
Pool | yes |
Garden | yes |
Parking | yes |
Cooling | yes |
Storage | no |
Elevator | no |
Built year | 2025 |
Floor | |
24 hrs Security System | |
5-10 minutes to Golf Course | |
Air Conditioning Hot/Cold | |
Built to High Standards | |
Close to all Amenities | |
Community gym | |
Community Pool | |
Completely Equipped Kitchen | |
Conveniently Situated for Golf | |
Conveniently Situated Schools | |
Conveniently Situated Tennis | |
Double glazing windows | |
En suite shower room | |
Exclusive Development | |
Good Rental Potential | |
Walking distance to beach | |
Walking Distance to Cafés | |
Walking distance to rest. | |
Walking distance to shops | |
Walking distance to t. centre |
Price: € 1.410.000,-
More information ›››
2 bed, 2 bath apartments are 100m2 built plus terrace of 30 m2 SOLD OUT!
4 bed, 3 bath apartments are 120m2 built plus terrace of 40m2, from 1.410.000 euros
Edificio San Pedro Beach located second line to the beach in San Pedro de Alcantara Marbella offers a very rare and special opportunity to buy a modern design, fantastic quality, brand new apartment between the beach and the new San Pedro Boulevard.
This new development consists of just 44 apartments, all with allocated underground parking and storerooms. There will be both two and three bedroom apartments on the ground floor and first floor, with amazing three-bed penthouses.
All apartments will have large terraces, a southerly orientation and the development will have attractive communal gardens and two swimming pools when it is complete. Specifications include fitted kitchen with oven, cooker, hob and integrated white goods, air conditioning and heat pump, wide floor to ceiling sliding terrace doors, built-in wardrobes in the bedrooms and all properties will be built to the latest European technical code.
Completion is scheduled for 2025